All Solutions
Battery Energy Storage System (BESS)
Maju Antara is the appointed EPCC partner for turnkey BESS installation in Malaysia, supplying and commissioning a commercial & industrial grade, all-in-one liquid-cooled energy storage cabinet designed for peak shaving, demand management, and energy cost reduction.
All-in-one liquid-cooled ESS cabinet 125kW/261kWh
Our all-in-one liquid-cooled ESS cabinet features advanced pack-level liquid cooling that maintains cell temperature differences within 3°C — extending battery life and improving round-trip efficiency. The modular design enables flexible parallel configuration from a single 125kW/261kWh unit up to a full array exceeding 1.5MWh, making it ideal for C&I applications across Malaysia.
| DC Side | |
|---|---|
| Cell Type | LFP 314Ah — Tier 1 manufacturer |
| Pack Config | 52.2 kWh / 1P52S |
| System Config | 261 kWh / 1P260S |
| Rated DC Voltage | 832 V |
| DC Voltage Range | 728 – 936 V |
| Charge / Discharge | 0.5P rate |
| AC Side | |
| Rated Output Power | 125 kW (Max 137 kW) |
| Rated AC Voltage | 400 V / 3W+N+PE |
| Power Factor | 0.99 / −1 to +1 |
| THDi | ≤ 3% |
Full technical specification
| GENERAL | |
|---|---|
| Round-trip Efficiency | ≥ 90% |
| Charge / Discharge Rate | 0.5C |
| DoD | 95% (25±2°C) |
| Cycle Life | ≥ 8,000 cycles (25±2°C, 0.5P, 95% DoD) |
| SOC Accuracy | < 3% |
| Nominal Frequency | 50Hz / 60Hz |
| Communication | Ethernet / RS485 / Modbus TCP |
| Ingress Rating | IP55 |
| PHYSICAL | |
| Cooling | Active liquid cooling |
| Operating Temperature | –25°C to 55°C |
| Humidity | 5–95% RH (non-condensing) |
| Noise | ≤ 75 dB |
| Elevation | ≤ 2,000 m (derating above 2,000 m) |
| Dimensions (W×D×H) | 1,050 × 1,350 × 2,400 mm |
| Weight | 2,600 kg |
| SAFETY | |
| Fire Safety | Aerosol fire suppression system |
| Fire Standard | UL9540A — highest conformity |
| Safety / EMC | UN38.3 · IEC62477-1 · IEC61000 · IEC62619 · IEC63056 · EN50549 |
| WARRANTY | |
| Battery Cell Warranty | Up to 10 years — Top 5 & Tier 1 cell manufacturer |
Why our liquid-cooled ESS cabinet
Compact all-in-one design
Top 5 & Tier 1 LFP cells
Pack-level liquid cooling
Modular & scalable design
Highest fire safety standard
Full integration ready
System Architecture
The MASB ESS cabinet integrates with utility grid, PV solar, and cloud EMS. Battery charges during off-peak hours; discharges automatically when demand approaches the MD ceiling.
Peak shaving
Tariff arbitrage
Backup power
Solar self-consumption
Applications Across Commercial & Industrial Sectors
Manufacturing & industrial parks
Peak shave Maximum Demand charges on TNB bills. Ideal for factories with high machinery startup loads and variable shift patterns. BESS charges during off-peak hours and discharges during peak tariff windows — directly reducing the highest kW recorded each month.
Commercial buildings & malls
Solve feeder upgrade limitations without costly infrastructure works. BESS handles EV charging demand spikes, HVAC peak loads, and demand response participation — while protecting the grid connection from overload events.
Data centres & critical facilities
Replace traditional lead-acid UPS systems with higher-safety LFP BESS. Provides backup power, smooths renewable energy fluctuations, and enables participation in power market reserves — improving reliability and asset utilisation.
Solar PV + BESS hybrid microgrid
Pair rooftop solar with BESS to maximise self-consumption. Store excess PV generation during daylight and discharge during evening peak demand — enabling near-zero grid draw during TNB peak tariff hours and accelerating solar ROI.
What Maju Antara delivers — end to end
As the appointed EPCC partner, Maju Antara manages the complete project lifecycle — from site feasibility through to long-term maintenance — backed by 45+ years of industrial engineering experience.
With Tanand's EasiEMS Pro, it becomes a measurable savings engine.
Hardware alone does not guarantee savings. Our ESS cabinet stores and releases energy efficiently — but without intelligent demand prediction, a static discharge strategy will miss peaks, drain the battery at the wrong time, and leave your TNB Maximum Demand unchanged. For measurable, contractable ROI, the BESS must be paired with an AI-driven EMS that predicts demand before TNB records it.
Why static BESS strategies underperform
How Tanand EasiEMS Pro solves this
Recommendation from Maju Antara
Maju Antara strongly recommends coupling every BESS installation with Tanand Technology’s EasiEMS Pro AI BESS Optimizer.
Hardware EPCC (Maju Antara) + AI software (Tanand) delivers up to 30% TNB Maximum Demand reduction with measurable guarantee — achieving ROI within 3.5 years.
Without AI optimisation, realistic MD savings are typically 10–15% at best.
Two partners — one measurable outcome
Savings potential by MD reduction level
| MD Reduction | Monthly Saving | Annual Saving | 10-Year Value |
|---|---|---|---|
| 100 kW | RM 9,861 | RM 118,332 | RM 1.18M |
| 200 kW | RM 19,722 | RM 236,664 | RM 2.37M |
| 300 kW | RM 29,583 | RM 354,996 | RM 3.55M |
| 400 kW | RM 39,444 | RM 473,328 | RM 4.73M |
| 500 kW | RM 49,305 | RM 591,660 | RM 5.92M |
Based on TNB tariff RM98.61/kW (Capacity + Network charges) · Actual results may vary by site
Ready to install BESS for your facility?
Contact Maju Antara for a site feasibility study and savings estimate based on your TNB bills.
Request a site assessment
Send us your last 3 months TNB bills and load profiles.
Maju Antara will size the BESS system and
provide a full EPCC proposal.
Learn about Tanand EasiEMS Pro
Ask us about coupling your BESS with
Tanand Technology’s AI demand optimizer
to achieve up to 40% MD reduction with
a performance guarantee.
